Process of the testing of occupational safety

flow chart

flow chart


Manufacturer contacts the test and certification body
in Mannheim Tel: +49 621-4456-3430 or
Mainz Tel: +49 6131/785-393
↓
The test and certification body sends an inquiry form for a detailed description of the equipment
↓ →
↑
Appointment of a date for testing between our inspektor and the manufacturer
The manufacturer returns the filled inquiry form to the test and certification body ↑
↓ ↑ Assessment of the equipment by the inspector at one of our test laboratories or at any other agreed location
Preparation of a quote with respect to the provided information ↑
↓ ↑ When the test is passed: Issuance of the inspection document (certificate
Is the manufacturer accepting the quote? ↑
yes
no
↓
If applicable: authorization for using a test mark
no test and certification; no costs!